Friday, September 23, 2016

Marblehead Adventures: Yacht Clubs and Dogs

A considerable amount of work went into arranging the 1,000 hour service with Hansen Marine on both ends. All of that work was lost when Bob Hansen stubbornly refused to address $600 of overcharges on 15 of 25 parts listed on the estimate. Bob's unfortunate defensive and belligerent response resulted in us losing faith in Hansen and cancelling the project. Clearly a lose/lose on both ends. Oh well.

So it's Monday, late morning, and the boat is in Marblehead at their town docks. We have the dock for 4 nights and the question was should we return to Hingham. We informed the harbormaster that we had cancelled the project and were considering an early departure. The harbormaster indicated that if we left early she would refund the unused nights. Nice response. We decided to stay as Marblehead is a rather spectacular town.

The 18 nautical mile cruise north to Marblehead was smooth as silk. My friend Skip Roper (and former crew member on the 2015 November run from Hinghan to Sarasota) accompanied me. We departed Hingham Shipyard at 7:15 AM and arrived in Marblehead around 10:00 AM. The weather was perfect with sunny skies and low winds. However, the 62 degree water temperature forced us off the flybridge and into the pilothouse for most of the run.

Passing Marblehead Light to port as we approach Marblehead Harbor

Marblehead is both a historic and wealthy community
Approaching the town docks. That's Skip on the bow
Marblehead Harbor is unique in may ways. As shown in the photo below, Marblehead is primarily a sailing harbor. Your view is southwest with the east side of Marblehead in the foreground. Marblehead Light is in the lower right hand corner and around it you'll notice some very large and expensive homes. Two yacht clubs, the Corinthian and the Eastern are within a half mile of the light.

Marblehead Harbor
Note: Permission was requested ftrom the owner. Response pending.
Across the harbor at the right center of the photo is a barely visible red building. That building is Abbot Hall, a museum at the highest point in Marblehead and the site of the town hall. Stay tuned for an article on Abbot Hall. The western side of the harbor contains the historic district and the venerable Boston Yacht Club

Below is a photo of Abbot Hall with the town docks in the foreground.

 Abbot Hall with the town docks in the left foreground
.
Guided Discovery at the Marblehead Town Dock
Looking aft (east) at the Town Docks
The harbormaster's office
There are no marinas in Marblehead Harbor, which I suspect is due to northeast orientation of the mouth of the harbor. That orientation exposes the harbor to northeast storms. My hypothesis is supported by the design of the town dock ramps. Notice the A-frame at the head of the ramp. The harbormaster has the ability to raise the ramps when the harbor gets rough, Below is a link to a YouTube video showing waves breaking over the sea wall in the Blizzard of 2014.

https://www.youtube.com/watch?v=YCPAzu_5E8c


Boats on a mooring can tolerate more turbulence than boats in a marina. Add the fact that Marblehead is the 23rd wealthiest town in Massachusetts (out of 351) and it not surprising that Marblehead has three really spectacular yacht clubs and except for three large (60+ foot) motor yachts, a harbor full of sailboats. Note: There are two other more modest clubs, Dolphin and Marblehead.

Older motor yacht on a mooring
Note: I have seen very few large motor yachts on a mooring
We visited two of the three yacht clubs. We started at the Corinthian. This 125+ year old club was organized on July 7, 1885 "to establish racing among smaller sailing vessels in busy Marblehead Harbor." The club has 475 member families. The bylaws require that 70% of the members be boat owners. The initiation fee is $12,000. The club has tennis courts, a large swimming pool  and fine dining.

The imposing Corinthian Yacht Club viewed from the ramp to their docks

30 foot plus launches at Corinthian
Kodi posing with the cannon at the Corinthian Yacht Club
Then we visited the Eastern Yacht Club, about a 1/4 mile down the road from Corithian. This club was founded in 1870. Below is an excerpt from their bylaws. According to a knowledgeable local, Eastern is 'old money" and Corinthian is "new money.'

"Article II, Section 5 of the By-Laws states that "priority shall be given to those candidates, otherwise qualified, who are yachtsmen or whose primary interest is in yachting or sailing, regardless of yacht or boat ownership". In addition, the By-Laws provide the Committee with the option of electing a candidate who is "a sole owner of a yacht" or "has, in the judgement of the Committee on Admissions, demonstrated outstanding participation and interest in yachting" notwithstanding the membership limit of 450 regular members."

Eastern Yacht Club with Marblehead Light in the background
By the way, they too have a cannon and so does the Boston, Dolphin and Marblehead Yacht Clubs. All five clubs fire their cannons at sunset. This is a lovely tradition but, unfortunately, Kodi HATES cannon fire (along with fireworks and gunfire).

Explanatory Note: Cannon fire, rifle fire, gun fire and fireworks all scare Kodi. Once the "guns" go off, Kodi shuts down. She will not respond to commands and refuses to leave the boat. This can be problematic especially in the evening when she needs to be walked. Unfortunately we live next to Stoddards Neck Park where the "locals" light off fireworks for weeks after July 4th. Did you know fireworks are illegal in Massachusetts? The "local cops" do not enforce the law so we struggle through a month of getting Kodi off the boat for her evening elimination.

Laurie and Summer
Speaking of the Kodi, we had a rather unusual incident while in Marblehead.  I noticed a man on our dock with a yellow lab and invited Kodi to go greet. Kodi and I walked onto the dock as the man and the dog departed on a skiff. I called to the man who then headed the boat toward the dock. The lab, whose name was summer, proceeded to jump off and greet Kodi. Then Summer jumped back in the boat and Kodi followed. The man, whose name is Laurie Willard, asked if Kodi could go with Summer and I said OK.

Kodi and Summer arriving back after an hour ride
An hour or so later Laurie, Summer and Kodi returned to our dock. We learned that Summer was a rescue and that except for a little separation anxiety was getting along well. Laurie invited Kodi for a puppy play date but we were unable to put it together.

Laurie supplied the following photos;


Kodi and Summer returning to Guided Discovery
Stay tuned for more on marblehead.

Written by Les.



Monday, September 19, 2016

Labor Day Fireworks and Tropical Storm Hermine

If you have followed this blog over the years, you know that once we get to Hingham Shipyard Marina we tend to stay in port. In fact, since arriving on May 8th, the boat has been away from the dock a total of four times. One was a day cruise to Boston Harbor on a beautiful June Saturday.  One was a 2 mile maintenance run to Grape Island for bottom cleaning in August (Note: My marina will not let a diver clean the bottom at the dock). The third was an overnight at Fan Pier in Boston for the Labor Day Fireworks and the fourth was the run to Marblehead for the aborted 1,000 hour service. The latter led to the article Hansen Marine: Lazy, greed and Stupid, which if you have not read it is worth reading.

This brief article deals with our overnight cruise to Fan Pier to view the Labor Day Fireworks and with Tropical Storm Hermine. I suggested to my sister, Myrna, about a week earlier that it was time for a cruise and she suggested that we see the Boston fireworks. Myrna is the chief legal officer for the Fallon Company, which is developing Fan Pier.

Fan Pier artist rendering of the completed project
In the top center of the photo is Rowes Wharf, the unofficial center of Boston Harbor
and one of my sister's legal projects
According to Wikipedia, The Fallon Company is currently developing Boston’s Fan Pier, one of the most sought-after waterfront sites in the United States, and a catalyst for the revitalization of South Boston’s waterfront. Fan Pier is a nine-acre, 21 city block site which consisted largely of underutilized parking lots when the Fallon Company purchased it for $115 million in 2005. Today, it is a neighborhood consisting of four commercial towers – One Marina Park Drive, 11 Fan Pier Boulevard, 50 Northern Avenue, and 100 Northern Avenue – and a luxury condominium tower Twenty Two Liberty. A second residential building, Fifty Liberty, is currently under construction. Two more high-rise towers are planned. When complete in 2020, the $4 billion Fan Pier project will encompass three million square feet of commercial and residential real estate, public, civic and cultural space, including two parks and a 6-acre marina.

Myrna arranged dockage at the marina, which, by the way, looks nothing like the above photo. The marina is currently operating with temporary docks and will be the last part of the site to be developed.


Guided Discovery at Fan Pier
The tower at Logan Airport is in the background (right side of photo)
Tropical Storm Hermine also got into the act. We had been following this system, which had briefly reached hurricane strength while making landfall between Apalachicola and Steinhatchee Florida. By Saturday, Hermine had stalled east of New Jersey and south of Long Island. Sustained winds were 50 knots. The surface map showed that strong slow moving high pressure over northern Maine was holding the storm south of New England. I calculated that the situation would remain stable for at least 24 hours before the storm started moving north. You might say we had a weather window for our Boston overnight. The plan was leave Saturday afternoon and return to Hingham by mid-day Sunday.



We departed Hingham Shipyard Saturday at around 4:15 PM and arrived in Boston about at hour later. We enjoyed cheese and crackers on the aft deck and then proceeded to Babbo Pizzeria for dinner. Dinner ended and we returned to the boat just it time for the fireworks, which we watch from the boat deck.

We had a spectacular view as the fireworks, which were about 1 mile northwest of our position.  Our view was enhanced by a clear night with a easterly wind that blew the smoke toward the city. The display lasted 20 minutes.


iPhone photo by Diana
Sunday morning we awoke to beautiful day with clear skies and low winds. Tropical Storm Hermine was still stalled exactly where she was on Saturday morning. We took advantage of situation and took a short stroll along the Harborwalk.

Here what Boston redevelopment Authority says about the Harborwalk: "One of the most important components of the City's waterfront revitalization program is HARBORWALK, a continuous public walkway along the water's edge that is, in effect, a re-established shoreline. The HARBORWALK System connects the City’s neighborhoods to its Harbor, linking recreational, cultural and historic attractions, as well as access to public transit, including water transportation facilities. Currently 38 miles of HARBORWALK have been constructed and when completed the walkway system will stretch over 47 miles from Dorchester to East Boston."

Here are a few views:





We departed Boston at around 10:00 AM and headed back to Hingham. Winds began to pick-up slightly as we traveled the 9 nautical miles to the shipyard.

Tropical Storm Hermine reached Hingham on Monday morning. You might say she was a shadow of her former, self with wind gusts only reaching 30 knots.  Rainy conditions continued through Thursday with low winds by Tuesday.  Hermine was essentially a "non-event."

Written by. Les









Tuesday, September 13, 2016

Hansen Marine: Lazy, Greedy and Stupid

Watch out. Hansen Marine Engineering and XRT Power Systems in Marblehead Massachusetts is a service provider to avoid.

First an overview:
  • Lazy: It took them three tries over three months to produce an acceptable estimate for a Caterpillar 1,000 hour scheduled maintenance service
  • Greedy: They grossly overcharge on parts. An analysis of 15 parts produced an overcharge of $600. Some of the overcharges were ridiculous, like charging $64.80 for a part that I had previously obtained for $4.15. Further, there was no rhyme or reason to the overcharges - like a consistent mark-up.
  • Stupid: When the $600 overcharge was brought to the owner's, Bob Hansen's, attention he became belligerent and refused to budge on the pricing. 
The estimate for the 1,000 hour service was $7,706 or which $4,000 was labor at $115 per hour. Do the math. Even paying two technicians $30 an hour leaves a strong $55 profit margin on 37 estimated hours. Add to that the profit on parts, even if charged at retail, and they had a very profitable deal, Bob Hansen's refusal to correct the $600 overcharge resulted in our cancelling the project.

Lesson for Bob Hansen: You can cut a fat hog but first you have to catch it.

Now the story.

We've had the 63 Outer Reef for two and a half years and in that time period have made five 1,600 mile trips up and down the east coast as we snowbird between Sarasota and Hingham. Each of those runs racks up close to 200 engine hours. Caterpillar's first major service occurs at the 1,000 hour mark and includes four major tasks in addition to an oil change; inspect and clean the intercooler, heat exchanger, and turbo-charger and check valve adjustment. 

Explanatory Note:  We also need some transmission and generator maintenance. My Wheelhouse Technologies on-line computerized maintenance management program designates the tasks that are needed.

We passed the 1,000 hour mark on the May run from Sarasota to Hingham. So, upon arrival in Massachusetts, I set about to arrange for needed engine, transmission and generator services. And here I ran into my first obstacle. There is only one Caterpillar dealer, Milton Caterpillar, in Massachusetts and they seem to have little to no interest in marine work. They will only work on Caterpillar engines. They won't touch the transmissions or generators. Hence, I would have to hire another service vendor for those tasks. Not efficient.

Caterpillar also has three authorized service providers in my area. Sacchetti Marine in Plymouth, Windward Power in Fairhaven and Hansen Marine in Marblehead. So, shortly after arrival in Hingham, I reached out to Milton Caterpillar and the three authorized servicers for an estimate; providing each with a detailed list of required tasks obtained from my Wheelhouse Technology application. I also called and talked with the owner or service manager in the hope of establishing a bit of rapport so they would take my project seriously.

Bottom Line: Sacchetti, Windward and Milton Caterpillar did not respond and to add insult to injury, I contacted each personally several times to remind them that I was looking for an estimate. I guess I was not very persuasive.

Explanatory Note: Not to get off the subject, but getting maintenance and repairs performed in Hingham is VERY difficult; in fact almost impossible if you are a transient boater. Why? My best guess is that due to the short six month boating season, servicers must run lean and mean (e.g., too few technicians). 

Finally, on June 3rd and after much prompting, Hansen Marine finally sent an estimate. Hurrah! Oops, spoke to soon. The estimate, for $4,031, did not enumerate the specified tasks and did not contain a complete list of parts. Essentially, what they put on paper was a very expensive oil change.

Explanatory Note: Why do I require a complete list of parts and tasks? Simple. I want specificity on the tasks, so they get done, and most important, I want to ensure that the servicer has all of the parts on hand before starting the job. The 1,000 hour service is a three day job. Missing a part could delay completion of the project.

So I sent Hansen back to the drawing boards, reiterating that I wanted the tasks specified on the estimate and a complete list of required parts. More prompting (i.e., calls every other few days) and finally, on August 8 (yes, two months later), I finally get a revised estimate. Now the price is $6,131 and the four major 1,000 hour tasks are specified on the estimate. However, the parts list is still incomplete. How do I know? Remember, I have a computerized maintenance application (Wheelhouse Technologies). Wheelhouse specifies the maintenance tasks based on time and hours and provides a list of the needed parts for each task. While it took some work on my part, I was able to audit Hansen's estimate and in doing so provided them with a list 11 missing parts including nomenclature and part numbers.

Two weeks later (August 17), Hansen sends a revised estimate and this time they have it 98% correct. Hurrah! Now the price is $7,706. Not unreasonable especially with the added parts. We schedule the project for the week of September 12 and I agree to bring the boat to Marblehead.

Explanatory Note: Caterpillar dealers and authorized servicers charge time and their standard labor charge ($115/hr) and miles ($1.25/mile) to come to your boat. Hansen's technicians would have to drive through Boston rush hour traffic morning and evening (a two to three hour 68 mile round trip). Hence, over three days, I could easily rack up over $2,000 in additional travel charges. Bringing the boat to Marblehead costs far less ($100 in fuel and $500 for dockage).

My daughter, Lesley, my granddaughter, Amelia, and my son-in-law, Scott, spent last weekend with us on the boat in Hingham. Scott is a biology teachers who runs a jet ski rental business on Cape Cod (Aquasport in West Dennis) during the summer. Scott and I got to talking about maintenance and he proceeded to tell me a story about a Yamaha dealer who grossly overcharged his company for a jet ski engine repair. Scott told me that he audited the parts on the dealer's invoice using the internet and discovered outrageous discrepancies. 

So I said, "let's, just for the fun of it, check Hansen's part pricing." Here again, Wheelhouse Technologies to the rescue. Wheelhouse, as one of their services, provide parts to their subscribers. This is a nice feature as sourcing boat parts can be very difficult. Note: Wheelhouse is upfront about their part pricing which is generally slightly over retail. Having ordered many of the parts on Hansen's estimate, I went one line and checked my order history. That's when I discovered the overcharges.

Examples. Charging $64.80 for a transmission zinc that I had previously obtained from Wheelhouse for $4.15. Two are required. Hence, a $121 overcharge. Charging $143.46 for a raw water impeller that Wheelhouse charged me $88.27. Another $110.38 overcharge for two impellers. Note: I later learned from my contact at Caterpillar that the impeller retails for $69.00. Other lower priced parts where also marked up but there was no consistency or logic to the mark-ups, which ranged from 15% to 65%. 

Unfortunately, I did not have pricing all of the parts so I called Wheelhouse on the way to Marblehead and my contact, Craig Parkhurst, provided me with their "over retail" pricing for the one's I was missing. Now I was ready to have a discussion with Hansen.

Tom, Hansen's service manager, and my primary contact at Hansen, arrived shortly after we docked. I showed Tom my parts audit and requested he go back and make some adjustments. A half hour later he called back and said that his boss, Bob Hansen, would not budge. I asked to speak with Bob and that's when things went down hill. Bob was immediately belligerent. He claimed that I should have brought this to his attention months ago. I reminded him that we had spent 3 months getting an estimate and that I had assumed that their pricing would be retail of close to that. Bottom line: I got him to concede that I could use my zincs and impellers (saving me $231 of the $600 overcharge).

Unfortunately, for Bob, Diana overheard Bob's belligerence and expressed a very legitimate concern. If he can't be reasonable on the parts, what happen if they screw up. Will he stand behind his work? We concluded that he probably would not. Diana wanted me to pack it in and tell Hansen that we would get the service performed elsewhere.

In the meantime. I called my contact a Caterpillar and reported the problem. Caterpillar expects better of their authorized repair facilities and offered to intervene with Bob Hansen. I said it was too late and that we had lost faith in Hansen.

At that point, Tom returned to the boat with another technician to start the job. I informed Tom that we were cancelling the project. I told him that a very unflattering blog article would be forthcoming and that he should bring it to Bob's attention. I also mentioned a formal complaint to Caterpillar. Bad behavior has consequences.

So here we are in beautiful (no exaggeration) Marblehead. We will spend four days here and then return to Hingham. I've already made arrangements to complete the 1,000 hour service when I return to Sarasota.

Written by Les.












Saturday, May 14, 2016

Hingham Adventures: Popping the Cork on a 17 Year Old NEW Boat

We were coming back from Quincy on Thursday morning (May 10) around 11:00 AM when we ran into a traffic jam at the Quincy Fore River Bridge. While sitting in traffic, I got a call from Bob Swartz, my friend and the diver who cleans Guided Discovery's bottom.

Side Story: Getting my bottom cleaned is a bit of a problem. Hingham Shipyard Marinas will not allow a diver to clean the bottom at my slip. Nor do they have the capacity to lift my boat. So, due to some insurance issue on the marina's side, or a policy to force the boaters to use their lift for bottom cleaning, I am forced to leave the marina and anchor off Grape Island. But that adds complication. Bobby and I have to coordinate weather and tide. If he could clean the bottom at the slip life would be easy. At Marina Jack in Sarasota, the number one marina in the USA (i.e., Dockage Magazine's Marina of the Year 2015), they allow bottom cleaning at the dock and supply the divers,

Back to the story. Turns out we were both caught in the same traffic jam, which was a coincidence. Bob was calling to check progress on our Sarasota to Hingham voyage. During the conversation Bob said he was headed to his cousin's home just over the bridge in Weymouth to watch the process of removing a 44 foot sailboat that his cousin had built - I repeat built by his own hand over 17 years - from the "garage" (shed - call it what you will). Would I like to see the boat?

You've got to be kidding. Of course was my answer was YES and Bob provided the address. After dropping Diana off at the boat I headed over to see the sailboat.

I arrived around 12:00 PM, met Chris Ready, Bob's cousin, and was blown away with the project.

The sailboat sits in the shed awaiting removal
Notice the wooden boards used a a ramp for trailer tires (more on this later)
A bit about the boat. She's a 44 feet long sloop (one mast) with a displacement of 26,000 pounds. She was built from 1" mahogany planking.  She has one stateroom and one head. She's powered by a 63 HP Westerbeke diesel engine and carries 100 gallons of fuel, which gives her a range of just under 300 miles when running UNDER POWER at her hull speed of 7 knots (1,800 RPM). Her mast is 50 feet tall. Running under sail her range is unlimited. She has a 100 gallon water tank and will have a water maker for long range cruising. Chris provided a machinery room for a generator but does not plan to install one.

Chris is a 52 years old semi-retired carpenter who was schooled as a boat builder. Building the boat is a dream that he has made come true.

Bobby Swartz and boat builder Chris Ready pose with the boat
Chris selected the project from a book of boat plans developed by naval architect Bruce Roberts Gibson. He's been working on the project for 17 years. The project started with the building of a shed in the back of his mother's home. Atop that shed is an apartment where he resides with his wife, Nancy. He explained that the hull and superstructure were built during the 9 months where temperatures in New England permit construction in an unheated shed. During the dead of winter he worked indoors building the interior. At present the interior is finished. Unfortunately, Chris had sealed the interior two weeks. I would have love to have seen it.



The boat is currently 90% complete. Finishing the project includes installing a 10,000 pound lead keel (fabricated in Rhode Island), which is waiting for the boat in North Carolina, and then fiber glassing the hull and topsides. That will be followed by installing the mast, boom, shrouds and stays, railing and running gear (shaft and propeller). Finally, the fiber-glassed hull and topsides will be painted.

Chris was forced to move the unfinished boat due the sale of his mother's home. The yet unnamed boat is headed for North Carolina where Chris will have a 12 month building season.

I asked Chris what was involved in building the hull and how did he bend the 1" mahogany planking to create a smooth hull. He explain that very little bending was needed due to the spacing of the bulkheads. Essentially, he laid the keel and then installed the vertical bulkheads. The planks were then installed one at a time. The hull has a very smooth finish as you can see in the photos.

View of planks attached to stringers
Now to the process of removing the boat from the shed. Certified Marine Transport was selected for the job. Bryan and his three man crew were not on site when I arrived but their transport trailer was.

Certified Marine Transport trailer parked in front of the Ready residence
Turns out that the transport trailer in the photo above was too big either to get under the boat or once under and loaded, the boat would be unable to clear the top of the shed. So, Bryan and crew had left to secure a smaller (lower) trailer.

transport trailer in position to begin loading
The transport is backed as far as she can go without jacking the stern


Chris removing the forward keel support
Removing the port aft hull support.
Notice the blue jack stand supporting the boat's weight
Now you see the starboard support beam

Now you don't
Jack stand supporting the stern. The wooden supports are about to be removed
Bryan using hydraulic levers to lower the transport for movement further aft
Chris watching as Bryan slides the transport further back
My contribution to the project
"Hey Chris. You may want to put level the steps to the driveway
The transport will have to go over the stairs so the hull doesn't contact the shed's sides
Hence the boards over the lower stair
Almost ready

Chris and Bryan confer minutes before the move
The photos will tell the rest of the story.

The bow emerges



We pause to assess the next move
Notice the proximity of the truck to the house
Bryan makes some final adjustments


The "baby" is born

Empty shed after 17 years
She's out! Now will she clear the house?

It's close!


All clear. Now what about that uneven area? Will she tip?



Will she make it?

YES!

She's safely on the street. Awaiting transfer to the larger trailer.
Putting the jack stands back in position
Bryan's team starting the process of removing the temporary transport trailer
Chris, relatives, friends and transport crew pose for a victory photo
Thanks to Bobby Swartz for sharing this with me,

Written by Les