Construction: Week 33 - The Project Moves Forward

Here's this week's photos annotated with progress in each area.

Note to readers: Check out the previous article (Week 32: Engines and Plans).  It contains some very interesting history.

Starboard side.  Fiberglass touch-up

Fore Deck: VIP hatch, bow seat and storage cover, LED lights, chain locker hatch

Port Side. No change

Aft view.  Fiberglass touch-up completed (Note blue tape has been removed)

Flybridge / Boat Deck.  Underside piece of boat deck (ceiling of walk-arounds) installed

VIP: Shelves, hatch and ceiling framed

Guest SR: Top bunk installed

Master looking forward.  Teak veneer on all bulkheads

Master looking to port

Master looking aft

Pilot House: Junction box for wiring (Note: Each wire is tagged)

Pilot House looking to port awaiting settee

Pilot House looking to starboard awaiting stair to flybridge

Looking aft from the pilot house

Salon forward: Cabinet to starboard, shelf of galley bulkhead

Salon looking aft: TV cabinet with lift and AV cabinet, wall sconce wiring, teak veneer on aft bulkhead

Engine Room: Air vents over fuel tanks and protective covers on engines


Lazarette: Auxiliary tanks enclosed, framing on catwalk, florescent lights installed

Lazarette: Aft bulkheads for storage lockers on either side.  Stainless steel pads for struts