Friday, December 20, 2013

Construction: Week 52 - Ready to Ship - Complete Set of Photos

The title says it all and the photos speak for themselves,  Further, the boat is completely clean, no workers, no tools and no debris.  Enjoy.

Notice in the first photo that the boat is sitting the barge that will transport it to the ship.

1. Port side view
Final bottom paint

2. Boat Deck looking forward

3. Boat Deck looking aft
4. Flybridge
4a. Flybridge control station

5. Flybridge Settee

6. flybridge looking to starboard

7. VIP Stateroom


8. Guest Head

9. Guest Stateroom

10. Master Stateroom looking forward
TV on the starboard bulkhead

11. Master Stateroom looking to port

12. Master Stateroom looking aft

13. Master Head

14. Pilothouse

15. Pilothouse stairwell, wine cooler and refrigerator

16. Pilothouse settee

17. Galley looking to  port

18. Galley looking forward

19. Salon looking forward
Awaiting salon table

20. Salon looking aft
20a. Salon Hi-lo Table
Finish: Wenge with teak and black border

20b. Salon Hi-lo table on stainless steel legs

21. Engine Room looking forward

22. Engine room looking aft


23. Lazarette looking forward

24. Lazarette looking aft.

25. Aft deck looking forward
From left to right
Port wing door
Refrigerator, storage and sink
Salon door
Boat deck access ladder
Starboard wing door

26. Aft deck settee with table slider mechanism

27.  Aft deck table
28. Salon sliding door
Boat deck access ladder

29. Aft deck sink
Next set of photos will show the boat being loaded onto the ship.

Written by Les.

1 comment: