Construction: Week 38 - Fashion Stripe & Electrical Panels

Things continue to move along with progress as usual evident in every area.

1. Port side view of the black "fashion stripe"

2. Starboard view of the fashion stripe

3. Flybridge and boat deck - No change

4. Hardtop sections mated and awaiting fiberglass finishing on seams.  Installation may occur this week.

5. VIP - No change

6. Guest SR drawers veneered

7. Master SR with berth storage areas sealed with epoxy paint

8. Master SR looking aft. Aft storage lockers veneered and drawer area covered with  epoxy paint

9. Pilot House with dash board framed out and DC Main Panel installed in cabinet

10.  Pilot House with platform for table and worker installing wiring for the AC Main Panel

11. Galley looking to port with the above counter cabinets awaiting installation. 
Epoxy paint in cabinets

12. Salon looking forward.  Windows framed, bulkhead veneered and above counter galley cabinets sitting on galley counter

13. Salon looking aft.

14. Engine Room looking forward - No change

15. Engine Room looking aft.  Continue work on wiring in the upper right corner.

16. Lazerette looking forward. Heavy duty wiring for the Inverter on port bulkhead.  Rotary switch under inverter.
Another rotary switch for battery control on starboard bulkhead.

17. Lazerette looking to port.  Port portlight installed.  Sight gauge mount next to extension cord

18. Lazeretter looking to starboard. Sight gauge top and bottom mounts visible