1. Port side view of the black "fashion stripe" |
2. Starboard view of the fashion stripe |
3. Flybridge and boat deck - No change |
4. Hardtop sections mated and awaiting fiberglass finishing on seams. Installation may occur this week. |
5. VIP - No change |
6. Guest SR drawers veneered |
7. Master SR with berth storage areas sealed with epoxy paint |
8. Master SR looking aft. Aft storage lockers veneered and drawer area covered with epoxy paint |
9. Pilot House with dash board framed out and DC Main Panel installed in cabinet |
10. Pilot House with platform for table and worker installing wiring for the AC Main Panel |
11. Galley looking to port with the above counter cabinets awaiting installation. Epoxy paint in cabinets |
12. Salon looking forward. Windows framed, bulkhead veneered and above counter galley cabinets sitting on galley counter |
13. Salon looking aft. |
14. Engine Room looking forward - No change |
15. Engine Room looking aft. Continue work on wiring in the upper right corner. |
16. Lazerette looking forward. Heavy duty wiring for the Inverter on port bulkhead. Rotary switch under inverter. Another rotary switch for battery control on starboard bulkhead. |
17. Lazerette looking to port. Port portlight installed. Sight gauge mount next to extension cord |
18. Lazeretter looking to starboard. Sight gauge top and bottom mounts visible |
No comments:
Post a Comment