| 1. Port side view of the black "fashion stripe" |
| 2. Starboard view of the fashion stripe |
| 3. Flybridge and boat deck - No change |
| 4. Hardtop sections mated and awaiting fiberglass finishing on seams. Installation may occur this week. |
| 5. VIP - No change |
| 6. Guest SR drawers veneered |
| 7. Master SR with berth storage areas sealed with epoxy paint |
| 8. Master SR looking aft. Aft storage lockers veneered and drawer area covered with epoxy paint |
| 9. Pilot House with dash board framed out and DC Main Panel installed in cabinet |
| 10. Pilot House with platform for table and worker installing wiring for the AC Main Panel |
| 11. Galley looking to port with the above counter cabinets awaiting installation. Epoxy paint in cabinets |
| 12. Salon looking forward. Windows framed, bulkhead veneered and above counter galley cabinets sitting on galley counter |
| 13. Salon looking aft. |
| 14. Engine Room looking forward - No change |
| 15. Engine Room looking aft. Continue work on wiring in the upper right corner. |
| 16. Lazerette looking forward. Heavy duty wiring for the Inverter on port bulkhead. Rotary switch under inverter. Another rotary switch for battery control on starboard bulkhead. |
| 17. Lazerette looking to port. Port portlight installed. Sight gauge mount next to extension cord |
| 18. Lazeretter looking to starboard. Sight gauge top and bottom mounts visible |
No comments:
Post a Comment