Other news: I am departing for Taiwan on Thursday morning to visit the shipyard in Kaohsiung. My flight leaves at 10:25AM for Shanghai. This is followed by stop in Seoul South Korea and then, finally, I arrive in Kaohsuing on Friday afternoon. Two days in Kaohsuing to recover from jet lag and to do some touring and then 3 days at the shipyard. Expect lots of photos.
So without further ado, here are this week photos. Enjoy (as I certainly did).
1. Port profile Bow plate 75 and 100 pound stainless steel anchors Bow thruster tube |
2. Boat deck The flybridge control station is covered awaiting electronics |
3. Hardtop Complete and awaiting installation |
4. Radar Arch This isa its first appearance |
5. VIP Lighting Electrical switches and outlets Hinges on port and starboard storage lockers |
6. Guest State Room No change |
7. Master Stateroom Light stitches and three 110 volt outlets (for 6 plugs, 4 forward and 2 aft) Hinges on the gun locker |
8. Master looking aft Hard to tell what's happening here |
10. Pilothouse Settee |
11. Pilothouse looking aft GE Monogram stainless steel side by side refrigerator Nice perspective on the open layout Teak flooring being protected |
12. Galley Finish work of the back of the pilothouse settee |
13. Salon looking forward Settee woodwork Teak floor has been installed and protected |
14. Salon looking aft Teak decking installed on aft deck TV cabinet with installed lift mechanism with protective cover |
15. Engine Room looking forward Additional stainless steel rails Muffler on port engine Stainless steel plate for dual Racor fuel filters |
16. Engine Room looking aft Mufflers on both engines Work tray over port engine |
17. Lazarette looking forward Transformers for two shore power cords on starboard bulkhead |
18. Lazarette looking aft Work progressing on cabinetry |