Friday, October 4, 2013

Construction: Week 41 - She "Really" Comes Together

It took several minutes to decide on the title for today's article due to the fact that the incredible progress made this week involving every part of the boat.  Hence, the title "She "Really" Comes Together."

Other news: I am departing for Taiwan on Thursday morning to visit the shipyard in Kaohsiung.  My flight leaves at 10:25AM for Shanghai.  This is followed by stop in Seoul South Korea and then, finally, I arrive in Kaohsuing on Friday afternoon.  Two days in Kaohsuing to recover from jet lag and to do some touring and then 3 days at the shipyard.  Expect lots of photos.

So without further ado, here are this week photos.  Enjoy (as I certainly did).

1. Port profile
Bow plate
75 and 100 pound stainless steel anchors
Bow thruster tube

2. Boat deck
The flybridge control station is covered awaiting electronics

3. Hardtop
Complete and awaiting installation

4. Radar Arch
This isa its first appearance

5. VIP
Lighting
Electrical switches and outlets
Hinges on port and starboard storage lockers

6. Guest State Room
No change

7. Master Stateroom
Light stitches and three 110 volt outlets (for 6 plugs, 4 forward and 2 aft)
Hinges on the gun locker

8. Master looking aft
Hard to tell what's happening here

9. Pilothouse
Wenge trim and bull nose on control station
Instrument panel completed and covered awaiting electronics
Overhead panels with cutouts and black fabric covering
Teak floor with wenge stripe

10. Pilothouse Settee

11. Pilothouse looking aft
GE Monogram stainless steel side by side refrigerator
Nice perspective on the open layout
Teak flooring being protected

12. Galley
Finish work of the back of the pilothouse settee

13. Salon looking forward
Settee woodwork
Teak floor has been installed and protected

14. Salon looking aft
Teak decking installed on aft deck
TV cabinet with installed lift mechanism with protective cover

15. Engine Room looking forward
Additional stainless steel rails
Muffler on port engine
Stainless steel plate for dual Racor fuel filters

16. Engine Room looking aft
Mufflers on both engines
Work tray over port engine

17. Lazarette looking forward
Transformers for two shore power cords on starboard bulkhead

18. Lazarette looking aft
Work progressing on cabinetry
Written by Les.

No comments:

Post a Comment