Howard took these photos on Friday afternoon, October 18, 24 hours after my departure from Koahsiung.  Therefore, I was on site and saw most of the progress as it occurred.  This posting is actually a week late.   I will be receiving Week 44 photos at 8:00AM tomorrow and will probably post them over the weekend. 

Progress is happening very fast.  According to Tania and Outer Reef the boat will be finished by the end of November.  That is a short 5 weeks from today.

I've added photos that I took while at the shipyard.  These will provide some great views of spaces that we have not previously seen.  Howard's photos are numbered 1-18.  My supplementary photos are identified with an a, b or c.

1. Port view
Newly installed stainless steel haws hole ports

2. Starboard view
Same as above

3. Aft Deck
Transom water tight door
aft deck entry doors leaning on aft settee
Newly applied teak caulking to aft deck

4. Flybridge / Boat Deck
Dummy satellite dome on hardtop
Cabinetry for the gas grill
Flybridge settee table
Radar arch with base for open array
4a. Aerial view of the hardtop
Radar arch
KVH satellite dome and dummy

5. Flybridge
Stainless steel steering wheel
Aft facing hailer mounted under radar arch
Cabinetry for the gas grill
Storage locker to starboard

6. Boat deck
Fiberglass work in progress
Sink (bottom center of photo)
6a. Stainless steel boat deck rails
Stainless steel posts on aft deck supporting the boat deck

7. VIP Stateroom
Light switches and 110 volt outlets
7a. VIP & Guest Head Vanity
Medicine cabinet
Granite counter
Sink
Faucet
Storage cabinet with hinges
7b. VIP & Guest Head Shower
7c. VIP & Guest Head commode and shower


8. Guest stateroom - No change 

9. Master stateroom looking forward
Door for starboard side hanging locker (just to left of the worker)
Engine room access door to left of the entry way
 Explanatory Note: There are two doors from the master stateroom into the engine room.  A "decorative" door and a watertight door with a 30 inch space between the doors.  The "decorative door and the space provide additional sound deadening.

9.a. Bilge pump in space between master SR" decorative"  door and engine room door


10. Master SR looking to port
Light fixtures
Port lights
Hinges on the gun cabinet

11. Master looking aft
Door frames to your left awaiting installation
Watertight door to engine room open
11a. Master head
Storage drawer to your left
Sink with faucet to your right
Commode to your left
11b Close-up view of master head faucet

11c. Master head shower

7d. Master head electric powered commode
Control panel for master head commode just to the left of the commode


12. Pilothouse
Light switches to port (left corner of photo)
Engine controls in the box over the electrical panel
12a. View from the pilot house stairwell to the accommodations stairwell
12b. Stairwell leading from pilot house to accommodations
The space to the right is the linen closet with bottom storage drawer

12c. Linen locker with storage drawer underneath

13. Chart drawer (under the white box)
See photo below for drawer under the pilothouse settee

13a. View from pilothouse settee into a storage drawer on the inside of the galley island


13b. Same storage drawer viewed from the galley



13c. Actual storage drawer being fitted prior to application of teak veneer


14. Galley 
14a. Bank of four storage drawers inside the galley island prior to application of teak veneer
14b. Teak veneer being applied to island storage drawers
14c. Drawers and doors under sink being fitted
 

15. Salon looking forward
Workers covering areas of finished teak veneer

16. Salon looking aft
Protective covering on finished teak veneer
16a. Looking onto the aft deck from the salon
Notice the newly applied caulk to the teak aft deck

17. Engine room looking forward
Exhaust wrapped with insulation

18. Engine room looking aft
Exhaust wrapped with insulation


19. Lazarette looking starboard
Hose battery boxes 4 12 volt batteries
Door on workbench cabinets
Cabinet door to starboard aft open storage cabinet

21. Lazarette looking to port
Cabinet door on storage locker
 
21a. Lazarette looking aft
Cabinet doors on port hanging (to my right) and Glendenning cable master locker (for right)
 
21b. Glendenning Cablemaster (75 foot 50 amp cord)

21c. Hydraulic lines running to the 1000 pound davit on the boat deck
I hope you enjoyed the photos.

When I finished (sort of) this article the week 44 photos were 7 hours away.

Written by Les

1 comment:

  1. Today, I went to the beachfront with my children. I found a sea shell and gave it to my 4 year old daughter and said "You can hear the ocean if you put this to your ear." She placed the shell to her ear and screamed. There was a hermit crab inside and it pinched her ear. She never wants to go back! LoL I know this is totally off topic but I had to tell someone!
    fall protection system

    ReplyDelete