Friday, November 15, 2013

Construction: Week 47 - Almost There

The title of this article, "Almost There," really says it all.  The list of items that are awaiting installation in Taiwan is very short.  I've noted these items for each photo along with some of the items that will be installed during commissioning in Florida.

Enjoy.

1. Guided Discovery still in the water
Bow plate (a bit hard to see)
Six man life raft installed on starboard rail
Windshield wipers
Spotlight on brow of flybridge (just above the windshield)
Flagpole mounted on bow rail
 Awaiting installation:
  • Taiwan: Bow seat cushions, Glendenning remote control system, bottom paint and boot stripe
  • Florida: Marquip Boarding Ladder, EZ2CY hardtop enclosure


2. Flybridge
Cover on grill
VHF antenna on either side of hardtop
Fiberglass boxes on the boat deck lights (2) mounted on the hardtop
Glendenning remote plug-in
 Awaiting installation:
  • Taiwan: Stidd helm chair base, plexiglas wind deflector, settee cushions
  • Florida: Stidd helm chair seat and post

3. Boat Deck
Six man life raft mounted to starboard rail
Flagpole
110 Volt outlet for dingy batter charger (just to left of the flagpole)
 
Awaiting installation:
  • Taiwan: None
  • Florida: Dingy (see below)
Explanatory Note: This week we made our final decisions on the dingy and its equipment.  It will be an AB Nautilus 13 DLX with 60 HP Yamaha equipped with a Garmin 541s multifunction display that will have a GPS, chart plotter and color display depth sounder (utilizing an in hull transducer). The Garmin 541s will me mounted on top of the console.  We chose this model as it has a 5" screen non glare screen.  The boat will also have two Yamaha digital gauges; one displaying speed and fuel and the other RPM and trim.  A special mount will enable us to clip in our ICOM M36 VHF.  We also order a custom cover (Aqualon white) and a swim ladder.

The 13 DLX is a 13 foot rib (like our 11 foot Caribe).  With 60 HP it should have a top speed of 35 MPH and cruise comfortably at 30 MPH with two aboard.  The 13 DLX has seating for 5.  We expect that it will be able to get on plane with 4 persons, which our 30 HP Caribe could not do.

The 13 DLX weighs in fully equipped at 1,000 pounds.

3a. 13 DLX Overview

3b. AB Nautilus 13 DLX


4. VIP Stateroom - Finished
 
 Awaiting installation:
  • Taiwan: None
  • Florida: Mattress, decorative spread, shams and pillows
5. Guest Stateroom - Finished
Door mounted on hanging lockers
Worker installing lee board on lower bunk (for Amelia Myrna)
 Awaiting installation:
  • Taiwan: None
  • Florida:  Mattress, decorative spread, shams and pillows
6. Master Stateroom
Wall paper around port holes
 
  Awaiting installation:
  • Taiwan: Shoji screens
  • Florida:  Mattress, decorative spread, shams, pillows and carpeting
6a. Our shoji screens sitting in the carpentry shop

7. Master Stateroom looking aft
Door and drawers on the locker next to the engine room
Door on port hanging locker
Door on starboard hanging locker
Inside door to engine room
Watertight door protected
Ceiling complete
 Awaiting installation:
  • Taiwan: None
  • Florida:  Mattress, decorative spread, shams, pillows and carpeting
7. Pilothouse
Windshield wipers
Glendenning single lever controls (right of helm)
Outlets at the base of the settee
Ceiling rails protected
 Awaiting installation:
  • Taiwan: Stidd helm chair base, settee cushions
  • Florida:  Stidd helm chair seat and post 
8. Pilothouse looking to starboard
VHF installed
Stairwell finished with protected wenge newel posts
Wine cooler under stairwell
File drawer installed
Stairs with black Bolon treads (protected)
Fireboy emergency activator
 Awaiting installation:
  • Taiwan: None
  • Florida:  None
9. Galley looking to port and aft
Ceiling & lighting
Stainless steel ceiling rails
Cabinet door under sink
Drawers next to dishwasher
Trash compactor (left of dishwasher) still missing teak cover
 Awaiting installation:
  • Taiwan: Teak facade on trash compactor
  • Florida:  None
10. Salon looking forward
Ceiling & lighting
Stainless steel hand holds
Rope lighting illuminated
 Awaiting installation:
  • Taiwan: Settee cushions
  • Florida:  Barrel chairs (2), decorative pillows, area rug and window treatments
11. Salon looking aft
Recessed ceiling and lighting
Stainless steel hand holds on ceiling
Rope lighting illuminated

12. Engine room looking forward - No change
 Awaiting installation:
  • Taiwan: Catwalk coin-dot flooring
  • Florida: Tool chest mounted in the tray over the port engine
13. Engine Room looking aft - No change

14. Lazarette looking to port
____________ on forward bulkhead
 Awaiting installation:
  • Taiwan: Catwalk coin-dot flooring
  • Florida:  Hooks to hold our bikes
15. Lazarette looking to starboard - No change
 Awaiting installation:
  • Taiwan: Catwalk coin-dot flooring, stairwell from the swim platform to the lazarette
  • Florida:  None
As usual, my prediction that the sea trial would take place last week appears to be incorrect.  Perhaps this week?

According to Outer Reef, she will be finished in two weeks and then, hopefully, on her way to Fort Lauderdale.

Expected Shipping Date: December 15, 2014.  Expected Arrival Date: January 15, 2014.

Written by Les