News:
- Shipping Date: December 19, 2013
- Arrival in Florida: Around January 22, 2014
| 1. At the dock in Taiwan |
| 2. Transom, swim platform and aft deck |
| 3. Flybridge |
| 4. Flybridge controls Stidd helm chair base |
| 5. Boat deck Soft wire rail installed aft (Note: Facilitates removal of the dingy) |
| 6. VIP Stateroom - Finished Drawers under bunk |
| 7. Guest stateroom - Finished |
| 8. Master stateroom Wenge headboard surround Note: Coin dot engine room flooring on master berth |
| 9. Master looking aft Cabinet door installed (just to the right of the engine room access door) |
| 10. Pilot house Worker installing stidd helm chair base |
| 11. Pilot house looking to port Settee table installed 110 volt outlets |
| 12. Galley looking aft Teak panel installed on trash compactor Lift switches to the right of the trash compactor |
| 13. Salon looking forward Floor protected for shipping |
| 14. Salon looking aft Stainless steel table leg visible Awaiting installation of the table |
| 15. Engine room looking forward Awaiting coin dot flooring |
| 16. Engine room looking aft |
| 17. Lazarette looking forward Door frame installed Note: Awaiting installation of the water tight door |
| 18. Lazarette looking aft Ladder from the swim platform to the lazarette |
Written by Les.